Project Portfolio

500+ solar and backup power systems commissioned across residential, commercial, estate, and industrial sectors. Each project engineered for long-term reliability and grid-independent operation.

500MW+

Total Installed Capacity

12+

Years Industry Expertise

15

Sates Served

Industrial Manufacturing Facility

Ogun State

Solar Capacity

250kW

Battery Storage

500kWh

System Type

Three-Phase Hybrid

Commissioned

Q2 2023

Corporate Office Complex

Lagos State

Solar Capacity

120kW

Battery Storage

150kWh

System Type

Commercial Grid-Tie

Commissioned

Q4 2022

Luxury Residential Estate

Abuja

Solar Capacity

400kW

Battery Storage

600kWh

System Type

Centralized System

Commissioned

Q1 2023

Private Healthcare Facility

Rivers State

Solar Capacity

180kW

Battery Storage

300kWh

System Type

Critical Load Backup

Commissioned

Q3 2022

Boutique Hotel & Resort

Lagos State

Solar Capacity

90kW

Battery Storage

120kWh

System Type

Hybrid System

Commissioned

Q1 2022

Executive Residential Compound

Ondo State

Solar Capacity

30kW

Battery Storage

40kWh

System Type

Off-Grid System

Commissioned

Q2 2023

Telecommunications Tower Site

Kano State

Solar Capacity

15kW

Battery Storage

40kWh

System Type

Telecom Backup

Commissioned

Q 2025

Retail Shopping Complex

Kaduna State

Solar Capacity

200kW

Battery Storage

250kWh

System Type

Commercial Hybrid

Commissioned

Q4 2025

Cold Storage Warehouse

Lagos State

Solar Capacity

300kW

Battery Storage

450kWh

System Type

Industrial Three-Phase

Commissioned

Q1 2024

Portfolio Metrics

500+

Systems Commissioned

500MW+

Total Installed Capacity

98.5%

Average System Uptime

15+

Years Engineering Experience

FEATURED CASE STUDY

500kW Industrial Solar Installation

Manufacturing Facility, Ogun State

Large-scale manufacturing facility required grid-independent power for production continuity. Frequent outages were causing equipment damage and production losses exceeding ₦2M monthly.

Solution: 500kW three-phase solar array with 800kWh lithium battery storage. System designed to cover 90% of facility load with 8-hour battery autonomy for critical production lines.

Grid Independence

90%

Monthly Savings

₦1.8M

System Uptime

99.7%

ROI Timeline

4.2 years

Ready to power your project?

Consult with our engineering team to design a custom energy solution for your needs. We provide end-to-end service from feasibility to maintenance.